Diagnostic tests
Page 61
RESULTS:
1. If the SSR measures continuity or zero resistance it is shorted
to ground and should be replaced.
2. If the SSR resistance is correct refer to flow chart.
100 ohm
SSR
15B
14
13
9
10
12
5
1
2
6
4
8
229
0
18
14
15
15
15
Figure 6-54. – Testing Start Stop Relay (SSR)
TEST 44 - TEST STARTER CONTACTOR 
RELAY (SCR)
PROCEDURE:
1. Set a voltmeter to measure resistance.
2. Disconnect Wire  15  and Wire  17  from  the  Starter  Contactor
Relay (SCR).
3. Connect one meter test lead to the terminal that Wire 15 was
removed  from.  Connect  the  other  meter  test  lead  to  the  ter-
minal that Wire 17 was removed from. Resistance measured
should be approximately 75 ohms.
85
87a
30
86
SCR
87
16
15
17
13
75 ohms
Figure 6-55. – Testing Starter Contactor Relay (SCR)
RESULTS:
1. If the SCR measures continuity or zero resistance it is shorted
to ground and should be replaced.
2. If the SCR resistance is correct refer to flow chart.
TEST 45 - CHECk WIRE 15 CIRCUIT
PROCEDURE:
1. Set a voltmeter to measure resistance.
2. Remove the Fuse (F1).
3. Disconnect all Wire 15’s from the Start Stop Relay (SSR), dis-
connect Wire 15 from the Starter Contactor (SC), Disconnect
Wire 15 from the Start-Run-Stop Switch (SW1), and disconnect
Wire 15 from the Battery Charge Rectifier 2 (BCR2).
4. Remove Wire 15 from the fuse holder (F1). Connect one meter
test lead to wire 15 just removed. Connect the other meter test
lead to frame ground. INFINITY should be measured.
RESULTS:
If INFINITY was not measured a short on Wire 15 to 
ground exists. Inspect each wire 15 for a shorted con-
dition. Repair or replace as needed.
TEST 46 - CHECk WIRE 14 CIRCUIT
PROCEDURE:
1. Set a voltmeter to measure resistance.
2. Disconnect Wire 14 from the Start Stop relay (SSR).
3. Connect  one  meter  test  lead  to Wire  14  previously  removed.
Connect  the  other  meter  test  lead  to  frame  ground.
Approximately 38 ohms should be read.
RESULTS:
Refer back to flow chart. 
TEST 47 - CHECk FUEL SHUTOFF SOLENOId 
(FSS)
PROCEDURE:
1. Set a voltmeter to measure resistance.
2. Disconnect the plug from the Fuel Shutoff Solenoid (FSS).
3. Connect one meter test lead to one pin on the FSS. Connect
the  other  meter  test  lead  to  the  remaining  pin  in  the  FSS.
Approximately 38 ohms should be measured.
4. Connect one meter test lead to one pin on the FSS. Connect
the other meter test lead to frame ground. INFINITY should be
measured.