Manual De UsuarioTabla de contenidosSection 3 — OPERATION13Using a Standard “GTS” Transfer Switch13Control Console Components133.2.1 Hourmeter133.2.2 Auto/Off/Manual Switch13Safety Rules23.2.3 Fault Indicator Lamp13Section 1 – General Information43.2.4 15 Amp Fuse13Generator43.2.5 7.5 Amp Inline Fuse14Transfer Switch43.2.6 Set Exercise Time Switch14Automatic System Operation4Manual Transfer and Start-up14Generator AC Connection Systems4Automatic Operation14Main Circuit Breaker5Weekly Exercise Cycle14Generator Fuel System5Engine Block Heater14Engine Protective Devices5Section 4 — MAINTENANCE151.7.1 Low Oil Pressure Switch51.7.2 High Coolant Temperature Switch5Authorized Service Facilities151.7.3 Low Coolant Level Switch6Cooling System151.7.4 Overspeed Shutdown6DC Electrical System151.7.5 PCB Operation LED’s6Checking Fluid Levels151.7.6 Overcrank Shutdown64.4.1 Check Engine Oil15Unpacking64.4.2 Battery Fluid161.8.1 Unpacking Precautions64.4.3 Engine Coolant161.8.2 Inspection6Lifting the Generator64.5.1 Check Engine Oil Level16Specifications74.5.2 Check Battery161.10.1 Generator74.5.3 Exercise System161.10.2 Engine74.5.4 Inspect Cooling System16Fuel Consumption74.5.5 Perform Visual Inspection16Reconfiguring the Fuel System74.5.6 Inspect Exhaust System16Torque Specifications84.5.7 Check Fan Belt16Engine Oil Recommendations84.5.8 Inspect Engine Governor16Coolant Recommendations84.5.9 Changing Engine Oil16Before Installation84.5.10 Changing the Engine Air Cleaner17Section 2 — INSTALLATION84.5.11 Spark Plugs172.1 Generator Installation84.5.12 Coolant Change172.1.1 NFPA Standards9Miscellaneous Maintenance172.1.2 Other Published Standards94.6.1 Cleaning the Generator172.2 Generator Location94.6.2 Battery182.3 Generator Mounting and Support94.6.3 Battery Maintenance182.4 Basic Standby Electric System94.6.4 Battery Replacement182.5 Emergency Circuit Isolation Method104.6.5 Rodent Protection182.6 Total Circuit Isolation Method10Out of Service Procedure192.7 Grounding the Generator104.7.1 Removal From Service192.8 Generator AC Neutral Connections114.7.2 Return to Service192.9 Transfer Switch Start Signal Connections11Fuel Pipe Sizing192.10 Battery Installation11Scheduled Maintenance202.10.1 Vented Batteries11Section 5 — TROUBLESHOOTING232.11 Preparation Before Start-Up12Troubleshooting Points232.11.1 Prior to Initial Start-up12NOTES242.11.2 Transfer Switch122.11.3 Fuel System12ELECTRICAL DATA262.11.4 Generator Set Lubrication122.11.5 Engine Coolant122.11.6 Belt Tension12PARTS LISTS302.11.7 Electrical System12Section 10 — WARRANTY48Number of Main Bearings5No. of Teeth on Flywheel1041*1Tamaño: 4 MBPáginas: 52Language: EnglishManuales abiertas