Manual De UsuarioTabla de contenidosI. Warnings3TO THE OWNER4TO THE INSTALLER4TRANSPORTATION DAMAGE4II. Safety4ADDITIONAL SAFETY CONSIDERATIONS5ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS5III. Product Application5IV. Location Requirements and Considerations6GENERAL6CLEARANCES AND ACCESSIBILITY6HORIZONTAL INSTALLATION6FURNACE SUSPENSION7EXISTING FURNACE REMOVAL7THERMOSTAT LOCATION7V. Combustion and Ventilation Air Requirements8VI. Category I Venting (Vertical Venting)10VENTING10VII. Masonry Chimneys11CHECKLIST SUMMARY11CHECK 1 - PROPER CHIMNEY TERMINATION.11CHECK 2 - ANY SOLID OR LIQUID FUEL APPLIANCES VENTED INTO THIS CHIMNEY CHANNEL12CHECK 3 - CHIMNEY CROWN CONDITION.12CHECK 4 - DEBRIS IN CLEANOUT12CHECK 5 - LINER CONDITION.12CHECK 6 - DILUTION AIR.13CHECK 7 - COMPLETE THE INSTALLATION.13FIX 1 - LINER TERMINATION.13FIX 2 -CHANGE VENTING ARRANGEMENTS13FIX 3 - REBUILD THE CROWN.13FIX 4 - RELINING.13VIII. Electrical Connections14WIRING HARNESS14115 VOLT LINE CONNECTIONS14JUNCTION BOX RELOCATION1424 VOLT THERMOSTAT WIRING15SETTING THE HEAT ANTICIPATOR16SINGLE STAGE THERMOSTAT APPLICATIONS1624 VOLT DEHUMIDISTAT WIRING16FOSSIL FUEL APPLICATION16115 VOLT LINE CONNECTION OF ACCESSORIES (HUMIDIFIER AND ELECTRONIC AIR CLEANER)1624 VAC HUM17IX. Gas Supply and Piping17GENERAL17HIGH ALTITUDE DERATE17PROPANE GAS CONVERSION18GAS PIPING CONNECTION18UPFLOW INSTALLATIONS19GAS PIPING CHECKS19PROPANE GAS TANKS AND PIPING19PROPANE GAS PIPING CHARTS20X. Circulating Air and Filters20DUCTWORK - AIR FLOW20FILTERS - READ THIS SECTION BEFORE INSTALLING THE RETURN AIR DUCTWORK20UPRIGHT INSTALLATIONS21CIRCULATION AIR FILTERS21HORIZONTAL INSTALLATIONS21XI. Sequence of Operation (Integrated Ignition Control)21POWER UP21NORMAL HEATING SEQUENCE21NORMAL COOLING SEQUENCE21CONSTANT FAN22XII. Start-up Procedure and Adjustment22FURNACE OPERATION22FURNACE START-UP22FURNACE SHUTDOWN22GAS SUPPLY PRESSURE MEASUREMENT22GAS MANIFOLD PRESSURE MEASUREMENT AND ADJUSTMENT23GAS INPUT RATE MEASUREMENT (NATURAL GAS ONLY)23TEMPERATURE RISE23CIRCULATOR BLOWER SPEED ADJUSTMENT24ADJUST BLOWER HEAT OFF DELAY25CIRCULATOR BLOWER FAN TIMING ADJUSTMENT25XIII. Operational Checks25BURNER FLAME26AUXILIARY LIMIT CONTROL26PRIMARY LIMIT26XIV. Safety Circuit Description26GENERAL26INTEGRATED CONTROL MODULE26PRIMARY LIMIT26AUXILIARY LIMIT26ROLLOUT LIMITS26PRESSURE SWITCHES26FLAME SENSOR26XV. Troubleshooting26ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS26DIAGNOSTIC CHART27RESETTING FROM LOCKOUT27XVI. Maintenance27ANNUAL INSPECTION27FILTERS27FILTER MAINTENANCE27FILTER REMOVAL27UPRIGHT FILTER REMOVAL27INDUCED DRAFT AND CIRCULATOR BLOWER MOTORS28FLAME SENSOR (QUALIFIED SERVICER ONLY)28IGNITER (QUALIFIED SERVICER ONLY)28BURNERS28XVII. Before Leaving an Installation28XVIII. Repair and Replacement Parts28TROUBLESHOOTING CHARTS29WIRING DIAGRAM31Tamaño: 1 MBPáginas: 32Language: EnglishManuales abiertas