Manual De UsuarioTabla de contenidosManual1This Manual on SIMATIC NET NCM S7 for Industrial Ethernet5Contents111 Communication via Ethernet CPs in S7 Stations151.1 Industrial Ethernet161.2 SIMATIC S7 Communication with S7 Ethernet CPs171.3 PG/OP Communication via Industrial Ethernet211.3.1 PG Communication with STEP 7 over Industrial Ethernet231.3.2 OP Operation: Connecting Operator Interface Devices via Industrial Ethernet241.4 S7 Communication on Industrial Ethernet251.5 S5-compatible Communication (SEND/RECEIVE Interface)291.6 FETCH/WRITE Services (Server)321.7 Networking Stations with STEP 7331.7.1 Network/Project Variant: One Subnet – One Project351.7.2 Network/Project Variant: SIMATIC S5 and Non-SIMATIC Devices on the Subnet361.7.3 Network/Project Variant: Two or More Subnets – One Project371.7.4 Network/Project Variant: One Subnet – More Than One (Sub)Project381.7.5 Network/Project Variant: Several Subnets in Several (Sub) Projects411.7.6 Network/Project Variant: Connections between Subnets (TCP/IP)432 Installing and Starting the Ethernet CP with STEP 7452.1 General Information About the NCM S7 for Industrial Ethernet Option462.2 Procedure472.2.1 Creating an Industrial Ethernet Subnet482.2.2 Entering an Ethernet CP in the Hardware Configuration512.2.3 Displaying the Network Attachments of a Station552.2.4 Setting Further CP Properties572.2.5 “Substitute Objects” in the STEP 7 Project652.2.6 Configuring Communication Services682.3 Assigning Addresses for the First Time (Applies to Latest CPs)692.3.1 Addressing by Selecting the Target System in the SIMATIC Manager702.3.2 Addressing using the Properties Dialog in HW Config or NetPro732.4 Downloading the Configuration Data to the Target System743 SEND/RECEIVE Interface in the User Program773.1 How the SEND/RECEIVE Interface Works on the CPU783.2 Programming the SEND/RECEIVE Interface793.3 Data Exchange S7 CPU <–> Ethernet CP823.4 Additional Information843.4.1 Programming Data Transfer on TCP Connections843.4.2 Recommendations for Use with a High Communications Load854 Configuring Communication Connections874.1 Procedure884.2 Possible Connection Configurations894.3 Connections914.3.1 New Connection944.3.2 Connections to Partners in Other Projects964.3.3 Further Functions994.3.4 Connections Without Assignment1004.4 Configuring ISO Transport Connections1034.4.1 Specifying the Local Connection Endpoint1044.4.2 Specifying ISO Transport Addresses1064.4.3 Specifying ISO Transport Dynamic Properties1094.4.4 Checking ISO Transport Connection Properties1114.5 Configuring ISO-on-TCP Connections Properties1124.5.1 Specifying the Local Connection Endpoint1134.5.2 Specifying ISO-on-TCP Addresses1154.5.3 Checking ISO-on-TCP Connection Properties1184.6 Configuring TCP Connection Properties1194.6.1 Specifying the Local Connection Endpoint1204.6.2 Specifying TCP Addresses1234.6.3 Checking TCP Connection Properties1264.7 Configuring UDP Connection Properties1274.7.1 Specifying the Local Connection Endpoint1284.7.2 Specifying UDP Addresses1304.7.3 UDP with Broadcast and Multicast1334.7.4 Checking the Properties of a UDP Connection1374.7.5 Free UDP Connection1384.8 FETCH/WRITE Mode1394.9 Routing to Distribute Load1435 Programmed Communication Connections1455.1 Overview1465.2 Procedure1485.3 Configuration Data Block1495.4 Parameter Field for System Data (CP Networking)1505.5 Parameter Fields for Connection Types1525.5.1 Parameter Field for TCP Connection1535.5.2 Parameter Field for a UDP Connection1545.5.3 Parameter Field for an ISO-on-TCP Connection1555.5.4 Parameter Field for an E-Mail Connection1565.5.5 Parameter field for FTP connection1585.6 Subfield types1596 Programming FCs (Functions) and FBs for S7 Ethernet CPs1636.1 General Notes on FCs / FBs1646.2 Setting Parameters for FC Calls1676.2.1 Parameters for CP and Connection Assignment (input parameters)1676.2.2 Parameters for Specifying a CPU Data Area (input parameters)1696.2.3 Status Information (output parameters)1696.3 FCs for the SEND/RECEIVE Interface1706.3.1 FC5 AG_SEND / FC50 AG_LSEND1746.3.2 FC6 AG_RECV / FC60 AG_LRECV1846.4 FCs for Access Coordination with FETCH/WRITE1916.4.1 FC7 AG_LOCK1936.4.2 FC8 AG_UNLOCK1956.5 FB55 IP_CONFIG for Programmed Communication Connections1976.6 Numeric Data / Resource Requirements of the FCs2037 NCM S7 Diagnostics2057.1 Overview2067.2 Functions of NCM S7 Diagnostics2077.2.1 Installing and Starting NCM S7 Diagnostics2087.2.2 General Menu Commands2107.3 Starting Diagnostics2127.3.1 Establishing a Connection to the Ethernet CP2127.3.2 Starting Diagnostics from the CP Properties Dialog2127.3.3 Starting Diagnostics from the Windows Start Menu2137.3.4 Using a Gateway2157.3.5 Using the PC Station – Setting a Gateway with “PC internal”2177.3.6 Other Ways of Starting Diagnostics2187.4 How to Use Diagnostics2197.5 Starting Diagnostic Functions Explicitly2207.6 Checklist for “Typical Problems” in a System2227.6.1 Checklist for General CP Functions2237.6.2 Communication Connections Checklist2248 Firmware Loader2258.1 Application2268.2 Loading Firmware227A References229B Glossary233B.1 General Section234B.2 Industrial Ethernet238B.3 PROFInet240C Linking to Other Systems with FETCH/ WRITE243D Document History249Index251Technical Support254Tamaño: 1 MBPáginas: 255Language: EnglishManuales abiertas