Testing Checklist
4-4
Testing the Monitor
Testing Checklist
The tests described in this chapter are listed in the table below. Use this table
as a checklist.
as a checklist.
Topics
See...
Check Here
if Completed
Date
Completed
Functionality Assurance Tests
Performance Assurance Test
Performance Assurance Test
Power-On Self-Test
Alarm Test
Volume Control Test
Preventive Maintenance Tests
NBP
NBP
Performance Procedures
Battery Performance Test
Battery Performance Test
Temperature Test
ECG Performance
Respiration Performance
SpO
2
Performance
CO
2
Performance
Serial Interface and Nurse Call Signal Test
ECG Sync Performance Test
Patient Safety Tests
S(1) Ground Integrity
S(1) Ground Integrity
S(2) Electrical Leakage
S(3) Earth Leakage Current
S(4) Enclosure Leakage Current
S(5) Patient Leakage Current
S(6) Patient Leakage Current with Mains