Emerson MMI-20011276 Manuel D’Utilisation

Page de 78
Net Oil Computer Supplement
47
Operation Mode – NOC
T
ro
u
b
les
ho
oti
n
g
In
de
x
Se
rie
s
 300
Me
n
u
s
NOC Oper
ation
5.2.3
Time periods for average, minimum, maximum, and total values
For the current test, running average, minimum, maximum, and total values for each process variable 
are calculated from the beginning of the test. When the well test is stopped, the final values will be 
stored with the test data.
5.2.4
Other activity during a well test
Between well tests, you can use the Exit button to move between the Well Performance Measurement 
menu and the View menu. While a well test is in progress, you can use the Exit button on the Return 
to Well Test screen to move between the well test screens and the View menu. 
From the View menu, you can perform any available actions.
At any point from the well test screens, including during a well test, you can press the Security button 
to access the Configuration and Maintenance menus. The system does not prevent configuration 
changes, calibrations, or other procedures. However, many actions (e.g., reconfiguring well data) will 
cause discontinuities in the well test data, and many procedures will interfere with data collection. If 
you need to change system configuration or perform a maintenance procedure:
1. Stop the well test.
2. Make the required configuration changes or perform the required procedures.
3. Start a new well test.
Test times
Test started
Timestamp
Test time elapsed
Hours and minutes
Transient bubble time
Hours and minutes
Water cut overrange
Hours and minutes
Transient mist time
Hours and minutes
Table 5-4
TMR data – Well Test mode
Process variable
Definition
Mass flow rate
Current mass flow rate from the gas meter
2-phase mass total
Total mass of liquid and gas in the gas stream during all TMR intervals
TMR mass total
Calculated mass of gas in the gas stream during all TMR intervals
Mass carry-over
Total mass of liquid in the gas stream during all TMR intervals (2-phase mass total minus TMR 
mass total)
Oil volume carry-over
Volume of oil in gas stream during all TMR intervals
Water volume carry-over
Volume of water in gas stream during all TMR intervals
Transient mist time
Hours and minutes that TMR has been active
Table 5-3
Production data – Well Test mode continued
Process variable
Values
Actual Avg
Min
Min time / 
date
Max
Max time / 
date
Total