NOTE
Upon completing installation, make sure that the probe is turned on and operating prior to
firing up the combustion process. Damage can result from having a cold probe exposed to
the process gases.
firing up the combustion process. Damage can result from having a cold probe exposed to
the process gases.
Power down all probes during outages. Sensor chamber is heated to 736°C. Further, if ducts
will be washed down during the outage, remove the probes to prevent water damage.
will be washed down during the outage, remove the probes to prevent water damage.