Emerson B-106-300NH Manuel D’Utilisation

Page de 182
Instruction Manual
IB-106-300NH Rev. 4.2
July 2002
Rosemount Analytical Inc.    A Division of Emerson Process Management 
Installation     2-25
World Class 3000
NOTE
Upon completing installation, make sure that the probe is turned on and operating prior to
firing up the combustion process. Damage can result from having a cold probe exposed to
the process gases.
Power down all probes during outages. Sensor chamber is heated to 736°C. Further, if ducts
will be washed down during the outage, remove the probes to prevent water damage.
2