Sonic Alert 704 Manuel D’Utilisation

Page de 105
 
 
March 2001 
 
Page 52 
AOC-11  Maintenance Planning
 
specified in the manual? 
• 
Does this information include 
a requirement for - defects, 
MELs, special 
inspections,hard landings, 
lighting strikes, etc 
Ref: CASS 726.08(1)(m)
 
12.  
*For aircraft operating under MEL 
authorities, how is repair interval 
planned and actioned? 
 
 
Ref: CASS 726.08(1)(m)
 
N/A 
      OK 
     Finding 
 
   
Not Checked 
  
 
 
 
 
 
13.  
Is the liaison between the operator 
and the maintenance contractor 
effective? 
• 
Is there any evidence that the 
communication process does 
not work? 
Ref: CAR 706.09(2)(a) / CASS 
726.04(1)(g)
 
N/A 
      OK 
     Finding 
 
   
Not Checked 
  
 
 
 
 
 
14.  
*Is the maintenance contractor 
consulted in the defect deferral 
process?  
 
Ref: CASS 726.04(1)(g) / CASS 
726.08(1)(v)
 
N/A 
      OK 
     Finding 
 
   
Not Checked 
  
 
 
 
 
15.  
Are maintenance requirements 
communicated to the AMO in 
accordance with manual 
requirements? 
 
Ref:
 
CASS 726.04(1)(g) / CASS 
726.08(1)(v)
 
N/A 
      OK 
     Finding 
 
   
Not Checked 
  
 
 
 
 
 
16.  
Does the operator maintain current 
inspection sheets as identified in 
the Maintenance Schedule?  
 
Ref: CAR 605.86 / Approved 
Maintenance Schedule (TP13094)
 
N/A 
      OK 
     Finding 
 
   
Not Checked 
  
 
 
 
 
 
17.  
Do inspection sheets cover all 
applicable areas of the aircraft as 
N/A 
      OK 
     Finding 
 
   
Not Checked