Sterling 882.00294.00 Manuel D’Utilisation

Page de 63
UdSP Upper 
Display 
Look 
None, Process Value, Limit 1 Low Set, 
Limit 1 High Set, Limit 2 Low Set, Limit 
2 High Set, Alarm 2 Low Set, Alarm 2 
High Set, Limit 3 Low Set, Limit 3 High 
Set, Alarm 3 Low Set, Alarm 3 High Set
Process - 
LdSP Lower 
Display 
Look 
None, Process Value, Limit 1 Low Set, 
Limit 1 High Set, Limit 2 Low Set, Limit 
2 High Set, Alarm 2 Low Set, Alarm 2 
High Set, Limit 3 Low Set, Limit 3 High 
Set, Alarm 3 Low Set, Alarm 3 High Set
Limit 1  
High Set 
LOC Lockout 
(0) no lockout, (1) Programming and 
Setup Page Locked, (2) Limit Set 
Points are the only Operation Page 
parameters accesible, (3) Full Lockout. 
0 2 
 
 
 
 
 
4-2 System Operation Procedures 
1.  Turn the disconnect switch on the control panel to the ON position.  Power is applied to the voltage 
line fuses and line side of the control power switch. 
2.  Turn the control power switch to the ON position.  Power is applied to the PLC and touch screen.  
Push the start button on the PLC and the valve will move to the start position as follows: 
a.  The valve motor rotates until the cam switch makes 2 transitions.  
b.  If the cam switch does not make a transition within 10 seconds, a valve 
motor fault alarm is generated.  The alarm horn and light are activated.  The 
valve motor, heaters, and blower shut off.  Pressing the ALARM SILENCE 
pushbutton will deactivate the alarm horn and light.   
Note:  Cycle control power to restart the dryer. 
c.  The valve will normally complete one full cycle (revolution).  If sequence 
shutdown is not initiated (in 10 Seconds) and control power switch or 
disconnect are turned off: 
1. 
The bed in process at power-down will remain in 
process. 
2. 
The bed in regeneration at power-down will remain in 
regeneration. 
3. 
The regeneration timing cycle will restart from the 
beginning. 
3.  Once the control power is on and no fault conditions exist, turning the Off-On switch to the ON 
position and pressing the START button on the touch screen will start the dryer as follows: 
a.  The process heater is turned on and controlled by the PLC. 
b.  The process/regen blower is started. 
c.  The regen heater is turned on and the regeneration timing sequence is 
initiated.  The regen heater is controlled by the PLC.   