Haier HLF103Q/R Manuel D’Utilisation

Page de 25
English
11
4-Wire Cord Connections
1. Remove the screws securing the terminal block access cover and the strain 
relief mounting bracket located on the back of the dryer upper corner.
2. Install a UL approved strain relief into the power cord entry hole of the 
mounting bracket . Finger tighten the nut only at this time.
3. Remove the green neutral ground wire from the green ground screw located 
above the terminal block.
Brass Terminal
Red
Tighten Nut to 
These Threads
Power Cord
Strain Relief
Mounting Bracket
Green Ground 
Screw
Green Neutral
Ground Wire
Terminal
Block
Black
Nut
Green Power Cord
Ground Wire
Black 240V
White Neutral
Red 240V
Green Ground
Typical Conductor
Receptacle
Typical 4
Conductor Cord