SECTION 14: OPERATION
Figure 35: Sequence of Operation Chart
NOTE: If the heater operates for more than 24 hours continuously, the ignition module will automatically recycle the 
burner to ensure that all safety functions are still in working condition.
14.1 Heater Lockout Indication (Optional)
In case of flame loss during operation of the heater, the 
burner control unit goes to lockout mode after three 
ignition trials. At this stage a signal or closed relay will 
enable the ROBERTS GORDON
®
 controller, BMS 
system, etc. to indicate precisely which heater has failed. 
This can be done by two options.
Cut/Pinch Hazard
Wear protective gear 
during installation, 
operation and service.
Edges are sharp.
WARNING
Failure to follow these instructions can result in death, electric shock, injury or property damage.
Burn Hazard
Allow heater to cool 
before service.
Tubing may still be hot 
after operation.
Explosion Hazard
Turn off gas supply to 
heater before service.
DANGER
Electrical Shock Hazard
Disconnect electric 
before service.
More than one 
disconnect switch may 
be required to 
disconnect electric from 
heater.
 
Heater must be 
connected to a properly 
grounded electrical 
source.
P
P
Fan Neon
Burner Neon
Neon
Ignition
Gas
Valve
Flame
Sensing
Pressure
Switch
Fan
Thermostat
KEY TO
SYMBOLS
T0
T1
T2
T3
T4
T5
T6
T7
10 sec
Tp
40 sec max.
Interruption of main
Tp
10 sec
Ts
10 sec
flame sensing
11 sec typical
T8
Lockout Alarm
Signal (optional)
Burner Lockout
signal received after
3 ignition trial 
failures