Nordyne SERIES M1B Manuel D’Utilisation

Page de 40
9
FLOOR CUT-OUT
FOR STANDARD
DUCT CONNECTORS
CL
CL
C
L
24" 
23 1/4"
21 3/4"
14 1/2"
2 1/4"
2 3/4"
20"
CUT-OUT FOR
 OPTIONAL
COOLING COIL
REAR WALL OF CLOSET OR ALCOVE
1 3/4"
2"
3/4"
CL
CL
CL
10"
CL
FURNACE OUTLINE
14 1/2" 
ALT FUEL-LINE
ENTRY 1 1/4" Dia.
FURNACE
OUTER
DOOR
FUEL
LINE
1 3/4"
3/4"
1 7/8"
2 7/8"
Figure 6. Cut-Out Dimensions for 
Standard Duct Connectors
FLOOR
CUT-OUT FOR
ROUND DUCT
(14 1/4” DIAMETER)
CL
CL
CL
CL
24" 
23 1/4"
21 3/4"
20"
CUT-OUT FOR
 OPTIONAL
COOLING COIL
ALT FUEL-LINE
ENTRY 1 1/4" Dia.
FURNACE
OUTER
DOOR
REAR WALL OF CLOSET OR ALCOVE
FUEL
LINE
1 3/4"
2"
3/4"
CL
CL
10"
FURNACE OUTLINE
1 3/4"
10"
3/4"
1 7/8"
2 7/8"
CL
Figure 7. Cut-Out Dimensions for 
Round Duct Connectors
Bend tabs 
up 90°
Mounting Plate
Duct 
Connector
Connector
Tabs
Supply 
Air Duct
Hole for
Gas Line
Wood Floor
Figure 8. Standard Duct Connector In-
stalled
If Floor Cavity
“X” is:
Duct Connector
Type & Part Number
Standard Duct
Round Duct
7/8” / (22)
901987A
904008
2” / (51)
901988A
904009
4-1/4” / (108)
901989A
904010
6-1/4” / (159)
901990A
904011
8-1/4” / (210)
901991A
904012
10-1/4” / (260)
901992A
904013
12-1/4” / (311)
901993A
904014
Note: Dimensions shown as Inches / (Millimeter)
Table 3. Duct Connector Sizes
“X”
FLOOR OPENING
FLOOR
CAVITY
SUPPLY AIR DUCT
Figure 9. Floor Cavity
Standard Duct Connector Installation
The standard duct connector is designed for use 
on ducts 12” in width. However ducts narrower 
than 12” may not allow suffi cient clearances 
for this type of installation. For an alternate 
installation method, see page 10.
1. Center the duct connector in the fl oor opening 
with bottom tabs resting on top of the supply 
air duct.
2. Mark the cut-out area on the supply air duct by 
tracing around the connector tabs (Figure 8) of the 
duct connector.
3. Remove the duct connector and cut out the 
marked area of the supply air duct 1/4” larger 
the actual cutout drawn.
4. Install the duct connector back in the fl oor 
opening with the bottom tabs extending into 
the supply air duct.
5. Install the mounting plate (Figure 8) under 
the back side of the duct connector. Align the 
screw holes in both components.
6. Secure the duct connector and the mounting 
plate to the wood fl oor with appropriate size 
screws.
7. Bend the connector tabs on the bottom of 
the duct connector upwards and as tight as 
possible against the supply air duct.
8. Bend both tabs on the mounting plate up 90°. 
See Figure 10, (page 10)
9. Seal all connections with industrial grade 
sealing tape or liquid sealant. 
  NOTE:  Requirements for sealing ductwork 
vary from region to region. Consult with local 
codes for requirements specifi c to your area.