GE Monogram ZDW24 WW Manuel D’Utilisation

Page de 8
7
Slide the
Unit into
the Cutout
4
Step
• Move the beverage center/wine chiller close
to the opening.
• Connect the power cord plug to the properly
grounded receptacle.
• Slide the unit into the opening.
3
Install
Leveling
Legs
Step
• Tilt the unit slightly to one side to access the
bottom corner holes.
• Install a U-Clip into the front and rear holes
on the bottom as shown.
CAUTION: See illustration. Be sure the tangs
on the clips are on the outside and the
straight portion is inserted into the holes.
• Screw the leveling legs into the U-clips all
the way until snug. Then, adjust the leveling
legs to installation height.
• Follow the same procedure for the opposite
side.
Installation
Beverage Center & Wine Chiller
A.
B.
C.
D.
kist
Sunkist
C
heck
kist
Sunkist
C
heck
Monogram