Chamberlain 3575CS Manuel D’Utilisation

Page de 76
9
INSTALLATION STEP 2
Install the Header Bracket
You can attach the header bracket either to the wall above 
the garage door, or to the ceiling. Follow the instructions 
which will work best for your particular requirements. Do 
not install the header bracket over drywall. If installing 
into masonry, use concrete anchors (not provided).
WALL HEADER BRACKET INSTALLATION
•  
Center the bracket on the vertical centerline with the 
bottom edge of the bracket on the horizontal line as 
shown (with the arrow pointing toward the ceiling). 
•  
 Mark the vertical set of bracket holes (do not use the 
holes designated for ceiling mount). Drill 3/16" pilot 
holes and fasten the bracket securely to a structural 
support with the hardware provided.
Lag Screw
5/16"-9x1-5/8"
HARDWARE SHOWN ACTUAL SIZE
Lag Screws
5/16"-9x1-5/8"
Highest Point of 
Garage Door Travel
Vertical
Centerline of
Garage Door
Header
Wall
Garage
Door
UP
CEILING MOUNT ONLY
Wall Mounting Holes
Optional 
Wall Mounting Holes
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.
UP
CE
ILIN
G M
OU
NT 
ON
LY
Door Spring
Header
Bracket
2x4
Structural
Support
Vertical
Centerline of
Garage Door
Horizontal
Line
UP
CEILING MOUNT ONLY
Ceiling Mounting Holes
The nail hole is for 
positioning only.
You must use lag screws
to mount the header bracket.
UP
Lag Screws
5/16"-9x1-5/8"
Garage Door
Vertical
Centerline
of Garage Door
Header Wall
– Finished Ceiling –
Header
Bracket
6" (15 cm) 
Maximum
Vertical
Centerline
of Garage Door
Door
Spring
CEILING HEADER BRACKET INSTALLATION
•  
Extend the vertical centerline onto the ceiling as shown.
•  
Center the bracket on the vertical mark, no more than 
6" (15 cm) from the wall. Make sure the arrow is 
pointing toward the wall. The bracket can be mounted 
flush against the ceiling when clearance is minimal.
•  
 Mark the side holes. Drill 3/16" pilot holes and fasten 
bracket securely to a structural support with the 
hardware provided.