Emerson 3-9000-771A Manuel D’Utilisation

Page de 124
Daniel 3818 LNG Liquid Ultrasonic Meter Installation Manual
Index
3-9000-771 Rev A
May 2012
Manual index
 101
Appendix C:  Index
C.1 Manual index
A
Acronyms, abbreviations and definitions
......................... 2
American Drill Bushing Company
..................................... 27
AMS Device Manager - Manual Setup
.............................. 69
AMS™ Suite Device Manager
................................................ 2
Analog
input switch settings
..................................................... 52
output switch settings
.................................................. 52
Analog output settings
......................................................... 52
C
Cable length
Open Collector mode
................................................... 35
TTL mode
.......................................................................... 35
Carr Lane Manufacturing Company
.................................. 27
Certifications and approvals
............................................... 12
Approval Agencies
......................................................... 13
standards
.......................................................................... 12
Conduit seals
........................................................................... 38
Configuration
.......................................................................... 59
Daniel MeterLink Setup
................................................ 59
Field Setup Wizard
......................................................... 61
open collector frequency outputs
............................ 35
protect switch setting
................................................... 53
Seal the unit
..................................................................... 80
D
Daniel Hoist ring part numbers
.......................................... 27
Daniel MeterLink software
..................................................... 5
DHCP server
............................................................................. 53
DHCP server switch settings
............................................... 53
Digital Input
............................................................................. 52
Digital Output(s)
..................................................................... 10
Dynamic Host Configuration Protocol
.............................. 2
E
Ethernet communications
................................................... 44
External ground lug
............................................................... 37
F
Fastenal
..................................................................................... 27
Frequency/Digital outputs
.................................................. 48
G
GPL
.............................................................................................. 83
H
HART
............................................................................................. 2
Highway Addressable Remote Transducer
...................... 2
Hoist Ring Thread Size
.......................................................... 27
I
I/O connections
....................................................................... 47
Input/Output
............................................................................. 3
Intrinsically Safe
........................................................................ 3
L
LGPL
............................................................................................ 83
Lifting slings
............................................................................. 23
correct sling attachment
............................................. 29
incorrect sling attachment
.......................................... 30
safety precautions using lifting slings
...................... 28
LNG applications
....................................................................... 1
LNG liquefaction loading (loading terminal)
........... 1
LNG liquefaction to storage (loading terminals)
.... 1
LNG receiving to storage (receipt terminal)
............ 1
LNG storage to regasification (receipt terminal)
... 1
LNG meter
electronic specifications
................................................ 9
meter performance
......................................................... 8
preinstallation considerations
................................... 11
specifications
..................................................................... 8
LNG meter specifications
....................................................... 8
M
MAC Address
.............................................................................. 3
Mechanical
installation
........................................................................ 15
Meter piping, lifting and mounting
.................. 15
Piping recommendation
s
................................... 18
Meter
............................................................................................ 8