Vermont Casting DBT36 Manuel D’Utilisation

Page de 34
10002789/0 
-13- 
DBT33/DBT36/DBT39
V
ERTICAL
 S
IDEWALL
 I
NSTALLATIONS
STEP 1
Locate vent opening on the wall.  It may be necessary to 
rst position the replace and measure to obtain hole location.  
Depending on whether the wall is combustible or non-combus-
tible, cut opening to size. (Fig. 22) 
(For combustible walls rst frame in opening. Fig. 22).  
COMBUSTIBLE WALLS :  Cut a 9-3/8"H x 9-3/8"W (240 
mm x 240 mm) hole through the exterior wall and frame as 
shown (Fig. 22).
NON-COMBUSTIBLE WALLS :  Hole opening should be 
7.5" (190 mm) in diameter.
STEP 2
Measure wall thickness and cut zero clearance sleeve parts to 
proper length (MAXIMUM 12” / 305 mm).  Assemble sleeve 
and attach to restop with #8 sheet metal screws (supplied).  
Install restop assembly (Fig. 23).
Zero clearance sleeve is only required for combustible walls.
STEP 3
Place replace into position.  (Fig. 24).  Measure the vertical 
height (X) required from the base of the ue collars to the 
centre of the wall opening.  
STEP 4
Apply a bead of silicone to the inner and outer ue collars of 
the replace and using three (3) screws attach an appropriate 
length of vent to the replace.  Follow with the installation of 
the inner and outer elbow, again secure joints as described in 
the section 'Joining DV Components'.
STEP 5
Measure the horizontal length requirement including a 2" (50 
mm) overlap, i.e. from the elbow to the outside wall face plus 
2" (50 mm)(or the distance required if installing a second 90º 
elbow. (Fig. 25).
Always install horizontal venting on a level plane.
Fig. 22
Fig. 23
Fig. 24
Fig. 25