Raypak 0042B Manuel D’Utilisation

Page de 40
RECEIVING EQUIPMENT
GENERAL SPECIFICATIONS
5
Code Requirements
7
Mounting Base
7
Clearance Requirements
7
Combustion/Ventilation Air
8
Venting Connections
9
Vent Damper Installation Location
11
VENT DAMPER WIRING
DIAGRAM
14
Gas Pressure
15
Water Connections & System Piping
15
Electrical Wiring
18
19
SERVICING PROCEDURES
26
General Location of Controls
26
SEQUENCE OF OPERATION
26
Intermittent Ignition Device (IID)
26
Lighting the Boiler
27
For Standing Pilot Models
27
Filling the System
27
Checking the Circulator
27
For Standing Pilot Models with
Robertshaw Gas Valve, 2-stage
Operation (Models 90, 13 & 180)
28
To Turn Off Gas to the Boiler
(Models 90, 135 & 180)
28
For Automatic Ignition Models
28
For Intermittent Ignition (IID)
with Honeywell or Robertshaw
Gas Valve (All Models)
29
To Turn Off Gas to the Boiler
29
Shut-down Procedure
29
Testing the Ignition afety Shut-off
30
Safe Shut-down Tests
30
Inspection Procedures
31
REPAIR PROCEDURES
32
Tube Cleaning Procedure
32
Heat Exchanger Removal
32
Heat Exchanger Re-assembly
33
Combustion Chamber Removal
33
TROUBLESHOOTING
34
Adjustment & Replacement of
Components
36
Replacement Parts
37
WARRANTY
38
CONTENTS
3