Cooper Lighting CPP/CPS Manuel D’Utilisation

Page de 5
Installation Instructions
Vault w/ visor
C-Scroll w/ visor
Roundel w/ visor
These installation instructions are valid with the above Ametrix styles
Warning
:  Before starting any work ensure 
that all sources of power are turned off.  All 
work must meet local/national codes and be 
performed by a certified electrician.  Do not 
mount fixtures vertically. 
Small, INDOOR
CPP/CPS
(Continuous Pendant)
Visor and Non-Visor
Sheet 1 of 5
ADY071477   REV A (ECN080352)
Pendant tube
Yoke arm
10-32 x5/8"
End screw
Pendant nut
(x2)
End pendant
assembly
Center pendant
assembly
Pendant tube
Power wire
from J-box
#10-32 x 5/8"
End screw
(2x)
Fixture wire
Center cover plate
#10-32 x 3/8"
Pan head screws
(2x)
Swivel pendant shown
Exploded view and part call-out
J-box
(by others)