Dometic 3400 Manuel D’Utilisation

Page de 20
4
STEP 5a: For through-the-floor water line and electrical 
wires, mark another centerline 6 inches (152 mm) from 
the back wall (fig. 4).
STEP 5b: For through-the-wall water line and electrical 
wires, mark a centerline 8 inches (203 mm) up from the 
floor centerline (fig. 5).
STEP 6: Make a 4-3/4 inch (121 mm) diameter hole (for 
most floor flanges) or a 5-1/8 inch (130 mm) diameter 
hole (for swivel joint floor flange) at the centerline mark 
furthest from the wall. Make a 1 inch (25 mm) hole at the 
mark closer to the wall for the water line and electrical 
wires (fig. 6).
STEP 7: Insert floor flange into larger hole and secure 
to the floor with #12x3/4-inch long flat head wood or 
sheet metal screws (fig.7). 
Fig. 5
Fig. 6
Fig. 4
IMPORTANT: The prefered floor flange installation 
method is to mount the floor fIange directly on the 
finished floor. However, if the bottom of floor flange 
and bottom of china toilet must be mounted at differ-
ent heights, the floor flange must be mounted within 
3/8 inch (10 mm) of the bottom of the toilet (see il-
lustrations in next column) or leakage may result. 
Below-Floor Installation
STEP  8:  Route  1/2-inch  (13mm)  PEX  tubing  through 
the smaller hole and install a PEX 1/2-inch MPT fitting 
(fig. 8). 
NOTE: A water shut-off valve should be installed in the  
water line to the toilet for maintenance requirements. 
Fig. 7
Above-Floor Installation
Fig. 8