Trane BAS-APG001-EN Manuel D’Utilisation

Page de 156
BAS-APG001-EN
39
Chapter 4
Installing the Tracer Summit 
BMTX BCU
Mounting the hardware
Make sure that the selected location meets the operating environment 
requirements described in this section and clearance requirements 
described in this Figure 16 on page 40. The BCU must be installed 
indoors. Trane recommends locating it:
Near the controlled equipment to reduce wiring costs
Where service personnel have easy access
Where it is easy to see and to interact with the operator display
Where public access is restricted to minimize the possibility of 
tampering or vandalism
CAUTION
Avoid equipment damage!
Install the BCU in a location that is out of direct sunlight. Failure to do 
so may cause it to overheat.
Operating environment requirements
Make sure that the operating environment conforms to the specifications 
listed in Table 11. Enclosure dimensions are illustrated in Figure 17 on 
page 41. 
Table 11.  Operating environment specifications
Temperature
From 32°F to 120°F (0°C to 49°C)
Humidity
10–90% non-condensing
Power requirements
North America: 120 Vac 
 
1 A maximum, 1 phase, 50 or 60 Hz
Weight
Mounting surface must be able to support 60 lb (28 kg)
Dimensions
16 ½ in. × 14 ¾ in. × 5 ½ in.
(418 mm × 373 mm × 140 mm)
Altitude
6500 ft (2000 m)
Installation
Category 3
Pollution
Degree 2