Runco CW-95DHD Manuel D’Utilisation

Page de 106
20
CineWall™ Installer/Integrator Manual
PRE
L
IMINAR
Y
4.
With the help of your assistant, grasp the chassis 
by the handles on either side and lift it straight up 
and out of the shipping container. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5.
Carefully unpack the screen by opening one end of the shipping container and sliding 
the screen out of the box. 
6.
Unpack the chassis hardware and verify that you have received all of the parts listed 
and shown below. 
Item Number
Description
Quantity
1
Top Flange
1
2
Light Blocks (Left/Right Sides)
2
3
Bottom Brackets (Left Center, Right Center)
2
4
Bottom Brackets (Left, Right)
2
5
Light Blocks (Bottom Left Center/Bottom Right Center)
2
6
Center Light Block/Strut Catch
1
7
Light Blocks (Bottom Left/Bottom Right)
2
(not shown)
Mounting Screws
(various)
Handles
1
6
7
2
3
4
5