Lucent Technologies Release 7 Manuel D’Utilisation

Page de 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1599
SYS-PRNT (System Printer) 
9
Link Retry Test (#215)
This test sends a message to the System Printer management software process 
instructing it to make a data call to the extension connected to the printer. If the 
System Printer link is already up, this test passes without making any data call.
Table 9-602.
TEST #213 Link Tear Down Test 
Error 
Code
Test 
Result
Description/ Recommendation
40, 50
ABORT
Internal System Error. 
1. Retry the command at 1 -minute intervals a maximum of two times.
1010
ABORT
The System Printer Link has been busied out.
1. Enter the release sp-link command to release the System Printer Link from 
the busyout state. 
2. Reissue the test sp-link long command to execute the test.
2012
ABORT
Internal System Error. 
1. Retry the command at 1-minute intervals a maximum of five times.
FAIL
Internal System Error. 
1. Retry the command at 1-minute intervals a maximum of two times.
PASS
The System Printer Link is torn down or a Short Test Sequence was executed 
and the link was not torn down.
Table 9-603.
TEST #215 Link Retry Test 
Error 
Code
Test 
Result
Description/ Recommendation
10, 20
ABORT
Internal System Error. 
1. Retry the command at 1-minute intervals a maximum of two times. 
30
ABORT
Internal System Error. 
recommended maintenance strategy.
1010
ABORT
The System Printer Link has been busied out.
1. Enter the release sp-link command to release the System Printer Link 
from the busyout state.
2. Reissue the test sp-link long command to execute the test.
2012
ABORT
Internal System Error.
1. Retry the command at 1-minute intervals a maximum of five times. 
Continued on next page