Lucent Technologies Release 6 Manuel D’Utilisation

Page de 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Install and Connect Cabinets 
Page 1-13
Connect AC Power and Ground 
1
Figure 1-4.
Power Distribution Unit (J58890CH)
2. Be sure the main power to the power distribution unit is OFF.
3. At the power distribution unit, set all carrier circuit breakers OFF.
Small Battery Holdover 
1. Connect the small battery holdover cable to J20. See 
Figure 1-4
.
Figure Notes
1. Connect small battery holdover cable (or 
temperature sensor cable from large battery 
cabinet) to J20
2. Carrier Circuit Breakers
3. Ground Terminal Block
4. Connect large battery holdover cable here
5. -48 VDC Return - 1/0 AWG (50 mm
2
) cable
6. -48 VDC - 1/0 AWG (50 mm
2
) cable
7. 1/0 AWG (50 mm
2
) 50 feet 
(15.2 m) cable to large 
battery cabinet. For 
cables greater than 50 
feet (15.2 m), contact your 
Lucent Technologies 
representative.
8. Ground Terminal Block
9. To AC load center or 
approved single-point 
ground block