Lucent Technologies Release 6 Manuel D’Utilisation

Page de 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Cable Ductwork 
Page C-2
 
C
Equipment room layout and expected growth determines which method to use. 
Installation of an overhead rack is covered by 
Cable Racks
 (800-614-157).
NOTE
:
Install all screws in all appropriate places to comply with electromagnetic 
interference (EMI) requirements for shielding.
Figure C-1.
Typical Layout of Assembled Ductwork
Figure Notes
1. I/O Cross-Isle Trough
2. Shielded Intercabinet Duct
3. AC Power Cable Duct 
4. Front of Cabinets
5. I/O Ducts to Cross-Connect Field
duct1 KLC 071796