Rhino Mounts FN180 Manuel D’Utilisation

Page de 194
MAINTENANCE
FN180/FN120   01/11
Maintenance Section 5-6
©2011 Alamo Group
MAINTENANCE
DRIVELINES
The Drivelines and U-Joints should be inspected each morning before the Cutter is started. MntP-R-0456 and
Mnt-R-0457.
The U-Joint and CV Joint on the Driveline undergo extreme forces when the unit is turning or when the Wings
are being raised. It is important that the U-Joints and CV Joint be greased each day before the unit is started.
The U-Joints are located at each end of the Center and Wing Drivelines. The CV Joint is located at the end of
the Main Driveline. The U-Joint and CV Joint assemblies are accessible by rotating the Driveline Safety Shield
until the hole in the Shield matches up with the Grease Fitting. UseN.L.G.I. #2 Bearing Grease for lubrication.
Inspect the U-Joint for wear by holding the shaft on one side of the U-Joint while trying to rotate the shaft on the
other side of the U-Joint. If there is noticeable movement in the Driveline replace the U-joint before it causes
severe damage to the Driveline.
STANDARD
EXTENDED LUBE
LEVER
LOCATION
 INTERVAL
       INTERVAL                     ACTION PUMPS
Cross & Bearings
 * 8 Hours
        50 Hours
  2 - 3
Telescoping Members
   8 Hours
        50 Hours
               8 - 10
CV Ball & Socket  (80º CV)
 * 8 Hours
        50 Hours
               4 - 6
CV Center Housing (80º CV)
              24 Hours
        50 Hours
12 - 15
CE & Non-Rotating Guard Bushings 
                8 Hours
        50 Hours
     2
(1000 RPM MAX.)
* Constant Angle applications may require a Lube Interval of 4 hours.
ROTATING GUARD BUSHINGS SHOULD BE LUBRICATED UPON REPLACEMENT
       80º CV DRIVELINE
   
  
TELESCOPING DRIVELINE