Cub Cadet 19A40002100 Manuel D’Utilisation

Page de 20
13
s
ectiOn
 4 — a
sseMbly
 & i
nstallatiOn
NOTE: An extra carriage bolt and lock nut have been 
supplied in your bagger kit in hardware pack 689-00163. 
You may replace the old hardware for the chute stop 
bracket with this new hardware, or save for later use.
NOTE: This chute stop bracket may stay on the unit even 
when the bagger is not being used.
Installing the Chute Strap on the Discharge Chute
Secure the strap to the chute with the hex screw (710-3015) and 
flange nut (712-04064) provided In Hardware pack 689-00163. 
See Fig. 20.
Installing the Discharge Chute
Reinstall the cutting deck to the tractor reversing the 
1. 
instructions for Deck Removal in operator’s manual of the 
tractor. 
Raise the deck to its highest position. 
2. 
Raise the chute deflector (A in Fig. 4-21) on the deck and 
3. 
hold it while you position the discharge chute over the 
chute opening.
Insert the hinge pin of the discharge chute into the tube on 
4. 
the chute stop bracket. See B in Fig. 4-21.
Installing the Chute Discharge Plate
Remove the discharge chute by removing the two flange 
1. 
lock nuts securing it.
With a hammer, lightly tap the bolts out. Discard the bolts 
2. 
and flange lock nuts.
Install the chute discharge plate to the bottom side of the 
3. 
deck opening, as seen in Fig. 4-18, using two carriage bolts 
supplied in hardware pack 689-00163.
Replace the discharge chute and secure with two flange 
4. 
lock nuts included in the hardware pack 689-00163.
Securely tighten the hardware at this time.
5. 
Attaching Chute Stop Bracket 
Remove the carriage bolt and lock nut holding the chute stop 
1. 
to the deck. See the left Inset of Fig. 4-19. Save the hardware.
Install the new chute stop bracket, from the loose parts, at 
2. 
the same position on the deck. See the right Inset of Fig. 
4-19. Secure with the hardware removed earlier.
A
C
B
Figure 4-19
Figure 4-18
Figure 4-21