Emerson 20/20 Manuel D’Utilisation

Page de 120
21 – 1
Vission 20/20 • Operation and Service Manual •Vilter/Emerson • 35391SC 1.8.5153
Section 21 • Maintenance
Overview
The maintenance screen is a convenient place to keep 
track of the the maintenance performed and any upcom-
ing maintenance recommended by Vilter. Based on this 
page, banners will be displayed on the lower status bar. 
Yellow banners are to warn the operator of any upcom-
ing maintenance and red banners indicate maintenance 
that is overdue, see Figure 20-1. Maintenance Screen.
Checklist
The check list is where the operator will perform the 
maintenance sign-off. Once the operator has selected 
the item to sign off, pressing the “Update” button at the 
bottom of the page will perform the sign-off operation 
and list the maintenance performed in the maintenance 
log.
Maintenance Name:
•  This column of tasks that should be performed at the 
run hours indicated in Maintenance interval column. 
Select the checkbox from the maintenance task name 
and press “update” button to perform the sign-off.
Maintenance Interval (Hours):
•  This column indicates the Run hours at which the task 
in the fi rst column should be performed. When a task 
is selected, the maintenance interval will change to 
refl ect the next interval.
Time Remaining (Hours):
•  This column indicates the Run hours left before the 
maintenance task should be performed.
Figure 21-1. Maintenance Screen