APC AP7900 Manuel D’Utilisation

Page de 186
®
USER’S GUIDE
Switched Rack PDU
30
Selecting a menu to perform a task
• To do the following, see 
:
– Configure the overload and low load thresholds for each phase or 
bank.
– Configure the 
Overload Outlet Restriction
 for each phase or bank.
– Set the 
Name
Location
, and 
Coldstart Delay
 for the Rack PDU.
• To do the following, see 
:
– Apply power to and remove power from the outlets.
– Set 
Power On Delay
Power Off Delay,
 and 
Reboot Duration
 for 
the outlets.
– Set the names and associated links for the outlets.
– Create, enable, and use synchronized outlet groups.
• To do the following, see 
– Access the event log.
– Configure the actions to be taken based on the severity level of an 
event.
– Configure 
SNMP Trap Receiver
 settings for sending event-based 
traps.
– Define who will receive e-mail notifications and Syslog messages for 
events.
– Test e-mail settings.
• To do the following, see 
– Access the data log.
– Define the log interval (how often data will be sampled and 
recorded) for the data log.