Nortel Networks Option 11C Mini Manuel D’Utilisation

Page de 334
Page 116 of 332
 Chapter 9 — Installing the chassis
553-3021-209
Standard 3.00
April 2000
Installing the chassis on a wall in a vertical position
Items required
To install the chassis on a wall in a vertical position, you require the following 
items:
equipment layout plan
chassis bracket
wall bracket
five 1 in. #12 wood screws provided in the bracket kit (or other 
appropriate fasteners) to hold the wall brackets and chassis on the wall
four #8 - 32 machine screws, used to attach the chassis brackets to the 
wall
one 3/4 in. (20 mm) piece of plywood fastened to the wall
The NTTK08 bracket kit contains all of the above items, with the exception 
of the equipment layout plan and the plywood.
Refer to Figure 22 on page 117 for guidelines on how to position the system 
components.
WARNING
An Option 11C Mini chassis is 30 lb. (13.5 kg) with circuit cards 
installed. An Option 11C Mini chassis is 26 lb. (12 kg) without circuit 
cards installed. Get help lifting the chassis if necessary.
CAUTION
An Option 11C Mini chassis is 30 lb. (13.5 kg) with circuit cards 
installed. Make sure that you fasten the equipment
 
securely
 
to the wall.
 
Use fasteners designed to hold securely to the type of surface that will 
support the equipment. When using 3/4 in. (20 mm) plywood, or other 
similar material as a backboard, make sure to attach the backboard
 
directly to the wall studs in a minimum of six locations.