Nortel Networks Option 11C Mini Manuel D’Utilisation

Page de 334
Page 236 of 332
 Chapter 17 — Connecting the telephones
553-3021-209
Standard 3.00
April 2000
Procedure 33
Connecting an off-premise telephone
1
Install the NTAK92AA Off-Premise Protection Module on the wall 
using four #10 1/2 in (minimum) screws.
2
Connect a #6 AWG (#40 Metric Wire Gauge) from the grounding 
lug at the bottom of the NTAK92AA Off-Premise Protection 
Module to an earth ground. Refer to Figure 68 on page 23
7.
Note: In the UK, use a 2 mm
2
 (#6 AWG) ground lug. In Europe, use a 
#6 AWG (16 mm
2
) ground lug.
3
Connect two NTAK9204 cables (one from connector J1 and one 
from connector J2) from the protection module to the 
cross-connect terminal.
Terminate the cables as shown in Figure 65 on page 231.
4
Cross-connect the J1 cable to the Tip and Ring connections 
coming from the line card.
Table 52 on page 242 provides the default DN assignments.
5
Cross-connect the J2 cable to the off-premise telephone.
6
Install the regulatory label provided with the Off-Premise 
Protection Module on the inside right-hand wall of the chassis.
7
Install the line card in its assigned position.
Now, you can activate the telephone, as described on page 244.
—————————— End of Procedure ——————————
Connecting an Attendant Console
Procedure 34
Connecting Attendant Console
1
Locate the Attendant Console terminations at the cross-connect 
terminal.
2
Locate the line card terminations at the cross-connect terminal.
WARNING
If connecting to a message waiting line card, unseat the card from its 
assigned slot before continuing with the next step.