Emerson ROC827 Manuel D’Utilisation

Page de 140
 
Issued Mar-06 
 
iii 
 
Contents 
Chapter 1 – General Information
 1-1 
1.1
 
1.2
 
1.2.1
 
Central Processor Unit (CPU) ............................................................................1-5
 
1.2.2
 
Processor and Memory ......................................................................................1-6
 
1.2.3
 
Real-Time Clock (RTC) ......................................................................................1-6
 
1.2.4
 
Diagnostic Monitoring.........................................................................................1-7
 
1.2.5
 
Options ...............................................................................................................1-7
 
1.3
 
1.4
 
1.4.1
 
Historical Database and Event & Alarm Log ....................................................1-11
 
1.4.2
 
Meter Runs and Stations..................................................................................1-12
 
1.4.3
 
Flow Calculations .............................................................................................1-12
 
1.4.4
 
Automatic Self Tests ........................................................................................1-13
 
1.4.5
 
Low Power Modes ............................................................................................1-13
 
1.4.6
 
Proportional, Integral, and Derivative (PID) .....................................................1-14
 
1.4.7
 
Function Sequence Table (FST) ......................................................................1-14
 
1.5
 
1.6
 
1.7
 
1.8
 
Chapter 2 – Installation and Use
 2-1 
2.1
 
2.1.1
 
Environmental Requirements .............................................................................2-2
 
2.1.2
 
Site Requirements..............................................................................................2-2
 
2.1.3
 
Compliance with Hazardous Area Standards ....................................................2-3
 
2.1.4
 
Power Installation Requirements .......................................................................2-4
 
2.1.5
 
Grounding Installation Requirements.................................................................2-4
 
2.1.6
 
I/O Wiring Requirements ....................................................................................2-5
 
2.2
 
2.3
 
2.3.1
 
Removing and Replacing End Caps ..................................................................2-6
 
2.3.2
 
Removing and Installing Wire Channel Covers..................................................2-6
 
2.3.3
 
Removing and Installing Module Covers............................................................2-7
 
2.4
 
2.4.1
 
Installing the DIN Rail.........................................................................................2-9
 
2.4.2
 
Securing the ROC827 on the DIN Rail...............................................................2-9
 
2.4.3
 
Removing the ROC827 from the DIN Rail .......................................................2-10
 
2.5
 
2.5.1
 
Attaching an Expandable Backplane ...............................................................2-11
 
2.5.2
 
Removing an Expandable Backplane ..............................................................2-12
 
2.6
 
2.6.1
 
Removing the CPU Module..............................................................................2-16
 
2.6.2
 
Installing the CPU Module................................................................................2-16
 
2.7
 
2.7.1
 
Installing a License Key....................................................................................2-18
 
2.7.2
 
Removing a License Key..................................................................................2-19