Installation Instructions
19
Figure 13 Typical Liebert FPC equipment arrangement
Liebert FPC
Remote Emergency 
Power Off Switch  (REPO)
Ground electrode conductor 
(not by Liebert ) required per 
NEC for units with transformer
ƒ
3-phase , 3-wire plus ground 
for units with transformer
ƒ
3-phase , 4-wire plus ground 
for units without transformer
Main input power to unit
(not by Liebert )
*Transient suppression plate
Main input junction box and cable
* Flexible distribution cables
  per customer specifications
* Optional devices : Refer to the 
specification sheet for options 
supplied
Low voltage junction 
box and cable
Building interface and 
alarm connections 
(not by Liebert )