PowerFile A3 Manuel D’Utilisation

Page de 76
6
 
  Preparing for Installation
Active Archive Appliance (A3) v6.5
PowerFile Confidential
 Racking and Installation Guide
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door completely 
(~25 inches).
Leave approximately 30 inches of clearance in the back of the rack to allow for sufficient 
airflow and ease in servicing.
This product is for installation only in a Restricted Access Location (dedicated equipment 
rooms, service closets and the like).
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating temperature of the rack 
environment may be greater than the ambient temperature of the room. Therefore, consideration 
should be given to installing the equipment in an environment compatible with the 
manufacturer’s maximum rated ambient temperature.
Reduced Airflow
Equipment should be mounted into a rack so that the amount of airflow required for safe 
operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not arise due to 
uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power supply circuitry 
and the effect that any possible overloading of circuits might have on overcurrent protection and 
power supply wiring. Appropriate consideration of equipment nameplate ratings should be used 
when addressing this concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself should be 
grounded. Particular attention should be given to power supply connections other than the direct 
connections to the branch circuit (i.e. the use of power strips, etc.).