Raypak Y-200 Manuel D’Utilisation

Page de 40
3
IMPORTANT SAFETY
INSTRUCTIONS
4
INTRODUCTION
4
Concept of Operation
4
Y-200 Controller Configurations
5
Y-200 Options
5
INSTALLATION
6
Mechanical Installation
6
Electrical Installation
6
Controller Field Wiring
8
Communication Field Wiring
9
Air Temperature Sensor Installation
9
Water Temperature Sensor Installation 10
Power Test
11
Installation Verification Procedure
12
CONTROLLER
FAMILIARIZATION
12
Control Screens
13
Circuit Board Layout
15
Keypad
16
Control Screen Displays &
Programming
17
01 Initial Screen
17
02 Primary Parameters
17
03 Control Band
18
04 Offset
19
05 Holiday
20
06 Reset Ratio
20
07 System Status
22
08 Water Temperature
23
09 Outdoor Cut-Off Temperature
23
10 Outdoor Cut-Off Deadband
23
11 System Monitor
24
12 System Temperatures
24
13 Auxiliary Delay
25
14 Boiler/Stage On Delay
25
15 Boiler/Stage Off Delay
26
16 PID
26
17 System Temperatures
27
18 Lead Change Time
27
19 Password
28
20 Setup
28
21 System Test
29
22 Set Password
29
23 Water Temperature Limits
29
24 Master Unit
30
25 Slave Unit
31
26 LonWorks
31
27 Factory Defaults
31
28 User Defaults
32
29 Modem Password
32
30 Alarm Call Telephone
33
31 Alarm Call ID
33
32 Alarm Call Retry
33
33 Alarm Call Events
33
34 PID
34
Master Unit with Slaves
34
Y-200 Master/Slave Diagram
36
Sensor Resistance
37
Illustrated Parts List
38
WARRANTY
39
CONTENTS