ADC ACE-142S/142V Manuel D’Utilisation

Page de 55
ADCP-96-015 • Issue 1 • July 2004
Page 20
© 2004, ADC Telecommunications, Inc.
2. If a ground spacer will not be installed, proceed to step 7. If a ground spacer (accessory)
will be installed, align the ends of the left ground spacer section with the ends of the right
ground spacer section and then press the two sections together. 
3. Place the assembled ground spacer in position for mounting on the PMF as shown in
.
Figure 11. Mounting the ACE-142V Cabinet on the Concrete Pad
4. Align the mounting holes in the ground spacer with the mounting holes in the PMF. 
5. Secure the ground spacer to the PMF using the four capscrews, four lock washers, and
four flat washers provided with the cabinet. Tighten all capscrews securely. 
Note: Make sure all remnants of concrete are removed from the PMF prior to mounting
the cabinet. It is not necessary to use shims to level or align the cabinet as long as the top
surface of the PMF is clean and free of any installation debris. 
ACE-142S
CABINET
(FRONT)
CABLE
CONDUIT
19816-A
CONCRETE
PAD
PAD MOUNTING
FRAME (PMF)
CAPSCREWS, LOCK
WASHERS, AND FLAT
WASHERS (4 PLACES)
GROUND
SPACER
(ACCESSORY)
HEX BOLTS, FLAT
WASHERS, AND
NUTS (4 PLACES)