Citrix Systems 9.2 Manuel D’Utilisation
Chapter 2 Configuring Advanced Policies
31
bind cache global NOPOLICY -priority 104 -gotoPriorityExpression
next -type RES_OVERRIDE -invoke resvserver lab2
To invoke a policy label from a Responder policy bank by using the
NetScaler command line
NetScaler command line
At the NetScaler command prompt, type:
bind responder global NOPOLICY <priority>
<gotopriorityExpression>
-type OVERRIDE|DEFAULT -invoke vserver|policylabel
<policyLabelName>|<vserverName>
Example
bind responder global NOPOLICY 100 NEXT -type OVERRIDE -invoke
policylabel responderlabel2
To configure a policy label by using the configuration utility
1.
In the navigation pane, expand the feature for which you want to configure
a policy label, and then click Policy Labels.
a policy label, and then click Policy Labels.
The choices are Integrated Caching, Rewrite, or Responder.
2.
In the details pane, double-click the label that you want to configure.
3.
If you are adding a new policy to this policy label, click Insert Policy, and
in the Policy Name field, select New Policy. For more information about
adding a policy, see
in the Policy Name field, select New Policy. For more information about
adding a policy, see
.
Note that if you are invoking a policy bank, and do not want a rule to be
evaluated prior to the invocation, click Insert Policy, and in the Policy
Name field select NOPOLICY.
evaluated prior to the invocation, click Insert Policy, and in the Policy
Name field select NOPOLICY.
4.
For each entry in this policy label, configure the following:
•
Policy Name: This is already determined by the Policy Name, new
policy, or NOPOLICY entry that you inserted in this bank.
policy, or NOPOLICY entry that you inserted in this bank.
•
Priority: A numeric value that determines either an absolute order of
evaluation within the bank, or is used in conjunction with a Goto
expression.
evaluation within the bank, or is used in conjunction with a Goto
expression.
•
Expression: The policy rule. Advanced policy expressions are
described in detail in the following chapters. For an introduction, see
described in detail in the following chapters. For an introduction, see
.
•
Action: The action to be taken if this policy evaluates to TRUE.
•
Goto Expression: Optional. Used to augment the Priority level to
determine the next policy or policy bank to evaluate. For more
determine the next policy or policy bank to evaluate. For more