Zhone Technologies 4000E Manuel D’Utilisation

Page de 22
16
4000E IP Broadband Loop Carrier Installation Instructions
IPD4-A2-ZZ40-20
The LK (Link) LED for each port being connected with a remote modem will 
illuminate solid or flashing green to indicate a connection has been 
established. Link up time between interface modules and remote modems can 
vary from one to five minutes depending on the quality, gauge and distance of 
the copper cable pair(s) being used. Refer to individual interface module user 
guides for specific information such as connector pinouts, parameter 
configurations and distance capabilities.  
Securing the Connecting Cables
Position all connecting cables such that they will not become a tripping 
hazard or pull loose from the chassis; secure with cable ties or hook-and-loop 
fastener straps.
Configuration and Management
Although no configuration is necessary to run subscriber lines at the default 
settings, all 4000E parameter settings are software selectable via Command 
Line Interface (CLI), Simple Network Management Protocol (SNMP), and/or 
the Network Management System (NMS). 4000E management capabilities 
depend upon the management module model installed in your chassis. Once 
the management module has been initialized, the interface modules installed 
in your 4000E may also be configured as desired. Refer to the following for 
further information:
05-17845
PWR
ADSL2+ INVERSE
MUL
TIPLEXER
1
2
3
4
5
6
7
RX
TX
LK
Table 1: 
User Documentation
Document
Contents
Management module 
installation instructions
(model-specific)
z
module installation
port pinouts
parameter defaults
parameter configuration options
management system capabilities
Uplink module 
installation instructions
(model-specific)
z
module installation
port pinouts
parameter defaults
parameter configuration options