RAD Data comm MBE10-8D Manuel D’Utilisation

Page de 58
MBE Family Installation and Operation Manual 
Chapter 3  Operation 
 
Operating Instructions 
3-3 
Power-on 
 
To power-up MBE: 
1.  Set the POWER switch on the rear panel to the ON position.  
The POWER indicator lights up, indicating that MBE is powered on. After 
about 1 minute, the operational status screen appears on the terminal 
screen.  
2.  Press the <Enter> key several times to display the password prompt. 
Operating MBE 
 
To operate MBE: 
1.  Configure MBE according to the application (see the 
LAN RANger Series 
Configuration Guide
).  
2.  During normal operation (when the remote workstations are active): 
 
The READY indicator lights up continuously 
 
The Tx and Rx indicators blink occasionally 
 
The LAN and LINK error indicators remain OFF. 
Power-off 
 
To power-off MBE: 
•  Set the POWER switch on the rear panel to the OFF position. 
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com