Hakuba PMD2 Manuel D’Utilisation

Page de 4
6  
 
Place a la
rge
 wa
she
r (1) ov
er 
mou
n
ting 
screw, and then 
in-
se
rt s
crew
 th
ro
u
gh g
ri
d
 at 
ma
rk
ed 
lo
catio
n
. (F
ig
. 8) 
 
 
 
 
 
 
 
 
 
 
 
 
Lift t
h
e p
roje
ctor
 mou
n
tin
g plate 
an
d pla
ce 
a s
eco
n
d
 larg
was
h
er
 (1) on
to t
h
en
d of
 th
e s
cr
ew, follo
we
d b
y a
 metal
 
spa
cer (2). 
Loosely t
h
read (2-3
 turns
) sc
re
w ass
emb
ly into 
the 
cho
sen
 t
h
rea
d
ed
 in
se
rt on
 t
h
e bottom of
 th
e p
rojector. 
(Fig. 9)  
 
 
 
 
 
 
 
 
 
Rep
eat t
h
is 
pro
cedu
re fo
r t
h
remaining threa
d
ed insert
s. 
(Fig. 10) 
 
Note:
 A 1”
 pla
sti
c sp
ac
er (
3) i
s in
cl
u
d
ed
 for
 proj
ect
ors 
with 
u
n
even
 mou
n
tin
g su
rf
ac
es. 
Tri
m
 t
h
e p
lasti
spa
ce
to the 
required l
ength, 
and instal
l on
 ap
propriate 
mounting screw. 
Fig. 8 
Fig. 9 
Fig. 10 
Onc
e all mounting s
cr
ews
 h
ave
 b
ee
n
 ins
talle
d
, sq
uar
e up the
 pr
oje
ctor
 mounting plate
and then tight
en 
the 
moun
ting s
cre
ws se
cu
re
ly
 
Caution:
 Do no
t force o
r ove
r tig
h
ten t
h
mounting sc
rew
s, o
r da
mage to t
h
proj
ecto
may o
ccu
r.  
Step 5 
Sl
ide 
th
e bottom proje
ctor mou
n
tin
plate 
on
to 
the p
reviousl
y in
stall
ed top
 proj
ector mounting 
plate. (Fig. 1
1)  
 
Note:
 Mak
e su
re
 that t
h
ca
ble
d
on’t get 
pin
ch
ed 
whil
sli
d
in
g th
e plat
es to
gethe
r.  
Fig. 11 
3  
 
Part
 
Projector Mou
n
ting Har
d
-
ware
 
Qty.
 
Bag
 
1 Larg
Wa
sh
er 
(a) 
2
 Metal
 S
p
ac
er:
 3/
8”
 
(a) 
3
 
Plasti
c Spa
ce
r: 1”
 
(b) 
  
PMD
-1
 
PMD
-2
 
  
  
4
 Sc
re
w: 
5mm x 
25
m
m
 
Sc
re
w: 
6mm x 
25
m
m
 
4 (c) 
5
 Sc
re
w: 
4mm x 
25
m
m
 
Sc
re
w: 
5mm x 
25
m
m
 
4 (c) 
6
 Sc
re
w: 
3m
m x
 2
5mm
 
Sc
re
w: 
4mm x 
25
m
m
 
4 (c) 
Step 1 
With
 a
n
 el
ec
tr
onic
 s
tu
d
 fi
n
d
er
, l
oca
te
 ce
nter
 of 
ceil
in
g stud in desired mounting loca-
tion. Unscrew 
cei
ling plate (
E
fro
m
 P
rojecto
Mounting top plate (
A
). Use 
ceil
ing pl
ate 
as a t
emp
late, an
d ma
rk
 mounting hole lo
cati
ons. 
Drill mounting holes to a
 d
epth of
 3” 
us
in
g a
 3/
16
” 
d
rill
 b
it
. M
ount
 c
eil
ing
 plate 
to stud with 5/1
6” 
lag bo
lts 
(J
). 
Har
d
wa
re B
a
g
Ex
te
nde
d Ce
iling M
o
u
n
F
or in
stall
atio
n
that 
require a 
cei
ling drop 
in exc
ess of
 18”, 
standard 1
 ½” pip
e ma
be 
u
sed 
to ext
en
d
 t
h
e stan
da
rd p
ipe 
d
rop a
s-
se
mbl
y.  
 
Pipe exten
sion
 s
h
ou
ld be cu
to 
th
e re
qu
ir
ed 
additional
 length, threa
d
ed on bot
h
 en
ds, 
and then atta
ched to th
e standa
rd 
pipe drop
 
assem
bl
y wit
h
 a 
pipe 
couple
r (not supplie
d). 
 
Note:
 Or
ie
nt th
e c
ab
le
 management por
on 
th
pip
e d
rop as
semb
ly
 s
th
at
 it 
faces 
the p
rojector ca
ble drop. 
Sta
nda
rd Ce
iling M
ount 
Pre
ss pla
sti
c co
ve
r (
D
) in
to pla
ce 
over 
cei
lin
g plate
.  
Attac
h
 pip
e drop ass
em
bl
(C
) to
 c
eilin
g plat
e wit
h
 t
h
ree 
5/
8”
 
hex
 s
cr
ew
s (
H
).  
Note:
 Or
ie
nt th
e c
ab
le
 management por
t on the
 pipe
 dr
op 
assem
bl
so that
 it faces the p
rojector 
ca
ble 
drop. 
Step 2 
Determine t
yp
e o
f install
ation: 
• 
Standard Ceiling 
Mount 
• 
Extended Ceiling 
Mount 
• 
Flus
h
 M
ount 
• 
Wall Mount