Gateway EC14 Manuel D’Utilisation

Page de 174
Chapter 3
107
Replacing the Button Board
1.
Put the button board to main board FCC through the upper cover and lay out correctly.
2.
Apply adhesive and stick the touch pad FCC down onto the upper cover.
3.
Connect the touch pad FCC to the touch pad.