Gateway EC14 Manuel D’Utilisation
Chapter 3
57
Removing the Upper Cover
1.
2.
Disconnect the button board FCC from the main board by unlocking the FCC cable and pulling away.
3.
Remove the nine screws in the upper cover.
Screw List
Step
Size
Quantity
Screw Type
Upper Cover
Disassembly
Disassembly
M2*3
3 (blue call out)
M2*5
6 (red call out)