Series 7400 Single Phase 1+N UPS 
A N N E X U R E 
 
Inter Connection cable details 
Any system essentially needs UPS module. However many 
customers need auxiliary cubicles such as Input Isolation 
Transformers, Battery Current Sharing Kit, 1+1 Paralleling kit, 
Bypass SCVS / SVR or Bypass Line Transformers. In case any of 
the auxiliary cubicle or combination of them is required & ordered 
by the customer, we would like to recommend following sequence 
in which the cubicles shall be located. 
 
 
 
 
SCVS 
or 
SVR 
 
 
 
TXR 
Cubicle 1  
 
 
 
UPS 1  
 
 
 
UPS 2  
 
 
 
TXR 
Cubicle 2  
or 
Battery 
Sharing Kit 
 
 
 
It should be noted that this is the recommended panel line up & 
based on this line up we will provide all interconnection cables. The 
interconnecting cables are supplied only if auxiliaries are in ENP’s 
scope. ENP is not responsible for supply of these interconnection 
cables in case the recommended Line up is altered. It is presumed 
that 
 
a) 
All the panels are in single line up. 
b) 
All the panels are placed in such a way that side covers are 
touching to each other. 
c) 
Location of UPS panels remain unchanged. 
d) 
In case any of the panel is not ordered its left hand side 
panel shall be shifted to ensure no gap between UPS & 
other panels i.e. in case Transformer Cubicle is not required 
the SCVS or SVR will be placed at the location of 
Transformer Cubicle. 
 
We are enclosing the typical interconnection diagram which will 
remain unchanged for all permutations & combinations of various 
options.