Emerson SERIES 600T Manuel D’Utilisation

Page de 168
Installation Drawings
145
Figure 153 UPS cable entry—bottom
( +
 )
 B
us
(-
) B
us
Gr
ou
nd
 B
u
s
Li
eb
e
rt
 F
S
C
abi
ne
t
U
n
it
 N
Li
eb
e
rt
 FS
Ca
b
in
e
t
Un
it
 N
Li
e
b
er
t F
S
Ca
b
in
et
Un
it
 N
3-
P
has
e
Ou
tp
ut
UP
S
CA
B
INE
T
3-
P
ha
se
In
p
ut
NOTES
1.
All
 ca
bl
es 
sho
u
ld
 b
e rou
ted
 b
efore 
bolti
n
g ca
bi
nets t
og
ether. 
2.
All Liebert FS cabinets sho
w
n w
ith front do
or o
pen.
3.
Cabine
ts
 show
n connected as 
one s
ystem.
 W
h
en
 con
n
ected
 to a U
P
mo
du
le
, a
ll pow
er 
and control wiring supplied by 
custom
er (standard) 
or Liebert (o
ption).
4.
See installation, 
operatio
n and
 ma
int
en
ance manua
l f
or ad
di
tiona
l in
formati
on.
5.
All
 ex
tern
al
 w
iri
ng
 is
 to 
be in 
accordance with nation
al
 a
n
d loca
l el
ectri
cal codes.
6.
Bus wi
rin
g must be capa
bl
e of ha
ndl
ing
 total
 lo
ad current.
7.
Power connection must be connected with
 a bus structure or to 
single 
point 
conn
ect
ion at the UPS (Do not da
isy-
cha
in)
.