Emerson M820D Manuel D’Utilisation

Page de 176
User Instructions 
UM1M820BNA 
Spec No. 1M820BNA (Model M820B) 
Issue AH, March 4, 2013 
Spec No. 1M820DNA (Model M820D) 
 
 
Chapter 1.  Introduction 
15 
 
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy 
Systems, North America, Inc.  Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited. 
For practical purposes, the battery capacity at the end of every recharge period is set to 100% as long as 
Step1, Step 2, and Step 3 have elapsed. 
If end of charge is not reached within the set maximum hrs, the recharge will be terminated anyway and 
discharge cycle will be initiated. 
 
1.3.12  Maximum Current Limit Function 
The current available from the rectifiers can be programmed (in AMPS) from 10% to 121% of combined 
rectifier capacity. The factory setting is 121% unless otherwise specified. The current available from the 
converters can be programmed (in AMPS) from 50% to 116% of combined converter capacity. The factory 
setting is 116% unless otherwise specified. Refer to the ACU+ Configuration Drawing (C-drawing) 
supplied with your system documentation for your system’s settings. 
If a rectifier or converter is added, the respective current limit point will automatically increase by the 
percentage each existing rectifier or converter was set to provide prior to the addition. 
If a rectifier or converter is removed from the system (and the Rect Comm Fail or Conv Comm Fail alarm 
is reset), the respective current limit point will remain unchanged unless the capacity of the remaining 
rectifiers or converters is not sufficient to maintain the present current limit point.  If that happens, the 
current limit point will automatically increase to the maximum (121% of the remaining rectifiers or 116% of 
the remaining converters).