Emerson 710NPBA Manuel D’Utilisation

Page de 60
UM581127000 
User Instructions 
Issue AB, March 22, 2012 
Spec. No. 581127000 (Model 710
NPBA
 
Page 44 
Chapter 4. Troubleshooting and Repair 
 
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy 
Systems, North America, Inc.  Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited. 
Replacing a Distribution Panel 
Refer to the Admonishments at the beginning of this document before performing this 
procedure. 
Danger:  Performing this procedure exposes service personnel to battery potential.  
Exercise extreme caution not to inadvertently contact or have any tool 
inadvertently contact any energized electrical termination. 
Procedure 
Note:  Refer to Figure 4-16 as this procedure is performed. 
Removing the Distribution Panel 
1)  Open the distribution cabinet
’s front door by turning the latch in the 
counterclockwise position. 
2)  Remove the plastic shield covering the circuit breakers or fuseholders on the 
panel to be removed by loosening the screws holding the shield and sliding the 
shield upwards. 
3)  Disconnect all load or battery wiring from the circuit breaker or fuse positions. 
4)  On panels equipped with a ground busbar, remove all load return or battery 
return wiring from the ground busbar. 
5)  On panels equipped with shunts, label the shunt leads then remove them from 
the panel. 
6)  Locate the in-line FA/CBA connector located near the back of the panel, and 
separate the connector halves. 
7)  Refer to Figure 4-16 and remove the hardware securing 
the panel’s Ground 
Busbar (if equipped) to the 
distribution cabinet’s busbar. 
8)  For load distribution panels, refer to Figure 4-16 and remove the hardware 
securing 
the panel’s System Load Distribution busbar to the distribution cabinet’s 
busbar. 
9)  For battery distribution panels, refer to Figure 4-16 and remove the hardware 
securing the 
panel’s Battery Busbar to the distribution cabinet’s busbar. 
10) For dual voltage load distribution panels, refer to Figure 4-16 and remove the 
hardware securing the -48V jumper leads. 
11) Refer to Figure 4-16 and remove the hardware securing the distribution panel to 
the distribution cabinet.  Remove the panel from the distribution cabinet.