Emerson 115-208 Manuel D’Utilisation

Page de 132
Installation Drawings
63
Figure 41 Liebert BDC connection to UPS
NOTES
1. All Liebert-supplied cable must be repositioned prior to and while the cabinets are being placed in 
their final installed location.
2. All interconnection hardware supplied by Liebert.
3. AC connections must be made to the UPS module before attaching Liebert BDC to UPS module.
4. All cabling will be field-supplied when a Liebert BDC is configured as a stand-alone cabinet.
5. Liebert BDCs must attach to the right side only of the Liebert
®
 APM
.
6. Refer to the individual drawing of each piece of equipment for additional details.