2.4   Preliminary Checks 
Before you install the UPS hardware you should carry out the following preliminary checks: 
1. Verify that the UPS room satisfies the environmental conditions stipulated in the equipment specification, paying 
particular attention to the ambient temperature, air exchange system, and dust density. 
2. Remove any packaging debris, visually examine the UPS and battery equipment for transit damage, both internally 
and externally. Report any such damage to the shipper immediately. 
2.5   Installation Drawings   
The following drawings illustrate the key mechanical characteristics of the various UPS system cabinets.   
Front view
Side view
Top view
Back view
Removable grille for lifting with fork-lift
truck (1 pcs in 1201*116, 2 pcs in 484*102)
1251
Air inlet
Removable grille - if using side
cable entry (2 pcs in 628*102)
87
3
19
05
Removable grille for lifting with fork-lift truck
(1 pcs in 1201*116, 2 pcs in 484*102)
Air
outlet
 
Figure 2-1    Front, side, top, back views of 160kVA/200kVA UPS (6-pulse rectifier) (unit in mm)