Installation Drawings
53
Figure 40 Lineup detail—1+N Type B connection to NX
Table 22
Interconnect wiring—1+N Type B connection to NX
Run
 From
To
Conductors
A1-A4
Utility AC Source
UPS #1-UPS #4 Module AC Input
Ph A, B, C - UPS Input
B1-B4
Utility AC Source
UPS #1-UPS #4 Module AC Input
Neutral - UPS Input
C1-C4
 UPS #1-UPS #4 Module AC Output
Paralleling Cabinet
Ph A, B, C - UPS Output
D1-D4  UPS #1-UPS #4 Module AC Output
Paralleling Cabinet
Neutral - UPS Output
E1-E4
Paralleling Cabinet
UPS #1-UPS #4 Module AC Ground
Ground-UPS
F
Paralleling Cabinet
Load AC Connection
Ph A, B, C - Load
G
Paralleling Cabinet
Load AC Connection
Ground-load
H
Paralleling Cabinet
Load AC Connection
Neutral-load
I1-I4
Paralleling Cabinet
UPS #1-UPS #4 Module
UPS Parallel Logic Board (M3)
Output Breaker Aux Contact
1 + N Parallel Cabinet
(front view without front door and panel)
1 + N Cabinet Interior View
(neutral and ground busbar location)
UPS Module Left Side View
(without side panel)
I1, I2
1. All Liebert-supplied cable must be repositioned prior to and 
while setting the cabinets in their installed location.
2. All interconnection cables and hardware supplied by others.
3. AC connections must be made to the UPS modules before 
attaching paralleling cabinet to UPS modules.
4. The interconnecting output cables between the paralleling 
cabinet and the UPSes must be the same size and the same 
length.
5. The location of the system output neutral busbar (connection 
K) and the ground busbar (connections H, I and J) are shown 
for a left-access style. For right-access version, these busbars 
are at opposite locations.
6. Refer to the individual drawing of each piece of equipment for 
additional details.