Emerson 300 Manuel D’Utilisation

Page de 20
INDEX
Printed in U.S.A.
Copyright --- ASCO Power Technologies, L.P. 2011
A
accessories, 5–2, 5–5
auxiliary circuits, 1–2
B
battery, 4–2, 5–1
buttons, push, 3–1
bypass time delay, 1–5, 2–1, 3–1
C
cable
lugs, 1–1
preparation, 1–1
catalog number, inside cover
cleaning, 3–1
connections
engine control contact, 1–2
line, 1–1
contact position indicators, 1–3
contacts
auxiliary, 1–2
engine control, 1–2
main, 1–3, 3–1
source availability signal, 5–2
control features, 5–1
load disconnect, 5–4
motor load transfer, 5–4
plant exerciser, 5–1, 5–2, 5–3
controller, 4–1, 4–2
codes, cover
cover removal, 4–2
disconnecting, 3–1
time delay potentiometers, 4–2
D
DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–4
E
electrical operation, 1–5
engine exerciser, 5–1, 5–2, 5–3
engine starting contacts, 1–2
F
features, see control features
frequency, pickup and dropout
settings, 4–1
functional test, 1–3, 1–4, 1–5
G
ground, controller, 1–1
H
handle, maintenance, 1–3
warning, 1–3
harness, 1–2
disconnect plugs, 3–1
HELP
800–800–2726 (ASCO)
customercare@asco.com
I
inphase monitor, 5–4
inspection, 3–1
installation, 1–1
L
labels,
engine starting contacts, 1–2
inputs / outputs, 1–2
rating, cover
lights, 1–4, 5–1
load disconnect feature, 5–4
lubrication, 3–1
M
maintenance, preventive, 3–1
manual load transfer, 3–2
warning, 3–2
manual operation, 1–3
warning, 1–3
motor load transfer feature, 5–4
N
nameplate, cover
O
operation
electrical, 1–5
manual, 1–3
illustration of, 1–3
warning, 1–3
sequence of, 2–1
optional accessories
programmable engine exerciser
& source availability signal
contacts, 5–2, 5–3
serial communication module, 5–5
strip heater, 5–5
P
parts, 3–1
problem, 3–2
programmable engine exerciser, 5–2,
5–3
R
rating label, cover
remote control features, 5–4
bypass transfer time delay, 5–4
inhibit transfer to emergency, 5–4
remote test, 5–4
remote transfer to emergency, 5–4
replacement parts, 3–1
S
service, call 800–800–2726 (ASCO)
set engine exerciser, 5–1, 5–2, 5–3
settings
changing, 4–1
factory, 4–1
frequency, 4–1
phase, 4–1
time delay, 4–1
voltage, 4–1
source accepted lights, 1–4, 1–5
T
terminal block, 1–2
test, functional, 1–3, 1–4, 1–5
time delay
adjustment, 4–1
gen–set cooldown, 4–1
how to change, 4–2
override momentary outages, 4–1
transfer to emergency, 4–1
transfer to normal, 4–1
timer (plant exerciser), how to set,
5–1, 5–2, 5–3
transfer switch position lights, 1–4,
1–5
transfer test, 1–5, 3–1
trouble–shooting, 3–2
V
voltage, phase, 4–1
voltage, pickup and dropout settings,
4–1