10.2.1 Startup Procedure
To start the UPS from a fully powered-down condition:
1. Open the external power switch.
2. Open the UPS door.
3. Connect the power supply cables.
4. Ensure the correct phase rotation.
5. Confirm that the address DIP switch of the main Liebert FlexPower assemblies are different from 
each other, and they are within 1 to 6. If they are the same, adjust them to create different Liebert 
FlexPower assembly addresses.
6. Close the external input circuit breaker and connect input power.
The LCD activates. The rectifier indicator flashes while the rectifier is starting. The rectifier 
enters normal operation state, and after about 30 seconds, the rectifier indicator stops blinking 
and is illuminated in a steady green. After initialization, the bypass static switch turns on. The 
mimic LEDs appear as showTable 30.
7. Ensure that the Liebert FlexPower assembly ready switches are latched (in Down position).
8. Close the external output circuit breaker.
9. Press the INVERTER ON button for 2 seconds. The inverter indicator flashes while the inverter 
is starting. After the inverter is ready, the UPS transfers from bypass to inverter, the bypass 
indicator turns Off, and the inverter indicator turns On. The UPS is in Normal Mode. The mimic 
LEDs will appear as shown below.
Table 29
Dip switch matrix
FlexPower Assembly Address
Flex Power 
Assembly 
Address Top to Bottom
Swtich Number Left to Right
1
2
3
4
5
6
Down
Up
Up
Down
Down
5
Up
Down
Up
Down
Down
4
Down
Down
Up
Down
Down
3
Up
Up
Down
Down
Down
2
Down
Up
Down
Down
Down
1
Up
Down
Down
Down
Down
NOTE
For standardization, if the quantity of modules in system is less than 6, for example 45kVA 
system, Emerson recommends setting the address bits of the modules as 1, 2, 3 respectively.
Table 30
Mimic indicators after initialization
LED
Status
Rectifier Indicator
Green
Battery Indicator
Red
Bypass Indicator
Green
Inverter Indicator
Off
Load Indicator
Green
Status Indicator
Amber